• Coil and fasten the ends of the tubing to prevent it from "whipping" if it
• Do not install a pressure regulator on the CO
• Do not use a padded tank (one to which another gas is added to increase
GC, GC/MS, and ALS Site Preparation Guide
breaks.
cooling would occur in the regulator instead of the oven.
the pressure).
Dip tube
Correct configuration
6850 Series GC Site Preparation
tank, as vaporization and
2
Incorrect configuration
99