Herunterladen Inhalt Inhalt Diese Seite drucken

Usa Fast Heating Oven, 240 V; Canadian Installation - Agilent Technologies ALS Handbuch

Inhaltsverzeichnis

Werbung

A proper earth ground is required for GC operations. Any interruption of the grounding
C A U T I O N
conductor or disconnection of the power cord could cause a shock that could result in
personal injury.
To protect users, the metal instrument panels and cabinet are grounded
through the three-conductor power line cord in accordance with International
Electrotechnical Commission (IEC) requirements.
The three-conductor power line cord, when plugged into a properly grounded
receptacle, grounds the instrument and minimizes shock hazard. A properly
grounded receptacle is one that is connected to a suitable earth ground. Be
sure to verify proper receptacle grounding. The GC requires an isolated
ground.
Connect the GC to a dedicated circuit.

USA fast heating oven, 240 V

The 240 V fast heating oven requires 240 V/15 A power. Do not use 208 V
power. Lower voltage causes slow oven ramps and prevents proper
temperature control. The power cord supplied with your GC is rated for
250 V/15 A, and is a two-pole, three-wire cord with grounding (type
L6-15R/L6-15P).

Canadian installation

When installing a GC in Canada, make sure your GC's power supply circuit
meets the following additional requirements:
• The circuit breaker for the branch circuit, which is dedicated to the
• The service box branch circuit is marked as a "Dedicated Circuit."
GC, GC/MS, and ALS Site Preparation Guide
instrument, is rated for continuous operation.
7890 Series GC Site Preparation
21

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

MsGc

Inhaltsverzeichnis