DYNACORD has made a great effort for the design and manufacturing of the components and also
supplies all documentation that enables the assembly of a safe and high quality voice alarm unit in
accordance with EN 54-16. DYNACORD has made up this list of requirements, based on the
standard, which needs to be filled in and subsequently signed off by both parties. The signed paper
has the nature of a certificate and can have significant meaning in the case of a legal investigation of
the liability issue for personal injuries.
-
The safety of the system in accordance with EN 54-16 in an alarm and emergency application
does not only depend on component safety, but also highly on the installation engineer and
the operator. For example, the sound pressure level of the system depends on the
installation. Moreover, the system should only be installed and operated by qualified
personnel.
-
Modifications of the system should only be executed by authorized persons in accordance
with the safety concept and need to be registered in the system documentation.
-
If EN 54 devices and non-EN 54 devices (e.g. a CD player for background music) are
assembled in one cabinet, it must be marked which devices belong to EN54 and which
devices do not.
-
Only use a Power-Supply- and Battery-Backup-Power-Supply-System that is certified acc.
EN54-4, in combination with the VACIE acc. EN54-16 and is part of the Declaration of
Performance (DoP) of the PROMATRIX 6000 System (e.g. PLN-24CH12).
-
The end-user must maintain a journal for the system.
-
The installer is responsible for security measures to prevent improper use of the system.
-
DYNACORD refuses any liability for damage that might result from non-observance of these
instructions.
-
The installer has to ensure that he uses certified firmware running on the devices.
Information, which firmware versions are applicable can be seen at the web page
Note
The EN 54-16 is a harmonized European standard referring to building products,
for an installation the project-depending country-specific standards must be
observed.
2018.02 I V2.3 IF.01U.317.503
Installer checklist
Installations Checkliste
/
PROMATRIX 6000 I EN 54-16
DYNACORD