Herunterladen Inhalt Inhalt Diese Seite drucken

Description Of Unit - Bosch EPS 205 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für EPS 205:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
en
42 | EPS 205 | Product description
3.6

Description of unit

3.6.1
Front view
10
9
8
7
Fig. 1:
Front view
1 LCD with touch screen
2 Pen
3 PC connections
4 Connection for external extraction
5 Oil collector
6 Master switch (with emergency stop function)
7 Internal extraction controller
8 Oil level indicator
9 Guard with handle
10 High-pressure hose
3.6.2
Rear view
2
Fig. 2:
Rear view
1 Connector for three-phase current (400 V)
2 Compressed air connection
|
1 689 989 185
2018-03-24
1
2
3
4
5
6
1
3.6.3
Components for testing
10
9
8
7
6
Fig. 3:
Components for testing
1 CRI Piezo return inlet
2 CRI Piezo return outlet
3 Clamp with clamping bolt for securing CRI/CRIN, CRI Piezo or
DHK/UI
4 Jet chamber
5 Injection chamber holder
6 Flushing drain
7 Clamping bolt for adjusting injection chamber holder height
8 Connection panel
9 Guard contact
10 Clamping bolt for adjusting clamp height
3.6.4
Connection panel
1
X20
6
Fig. 4:
Connection panel
1 Connecting cable for guard safety switch
2 Flushing connection for return quantity (CRI/CRIN)
3 Test connection for return quantity (CRI/CRIN/CRI Piezo)
4 Test connection for injected fuel quantity (CRI/CRIN/CRI Piezo)
5 Flushing connection and test connection (DHK/UI);
flushing connection for injected fuel quantity (CRI/CRIN)
6 Socket for CRI/CRIN/CRI Piezo
The flushing connection for the return quantity and injected fuel
*)
quantity (CRI/CRIN) has no function at present. It is intended for
possible subsequent extensions.
1
2
3
4
5
2
3
4
5
*)
*)
Robert Bosch GmbH

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis