Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing The Truck For Operation; Checks And Operations To Be Performed Before Starting Daily Operation - Jungheinrich EFG 213 Betriebsanleitung

Elektro-fahrersitz-gabelstapler
Vorschau ausblenden Andere Handbücher für EFG 213:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3

Preparing the Truck for Operation

3.1
Checks and operations to be performed before starting daily
operation
WARNING!
Damage and other truck or attachment (special equipment) defects can result
in accidents.
If damage or other truck or attachment (special equipment) defects are discovered
during the following checks, the truck must be taken out of service until it has been
repaired.
Report any defects immediately to your supervisor.
Tag out and decommission a faulty lift truck.
Only return the truck to service when you have identified and rectified the fault.
87

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis