Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing The Truck For Operation - Jungheinrich EFG 213 Betriebsanleitung

Elektro-fahrersitz-gabelstapler
Vorschau ausblenden Andere Handbücher für EFG 213:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.2

Preparing the truck for operation

Switching on the truck
Requirements
– For checks and operations to be performed
before starting daily operation, (see "Checks
and operations to be performed before starting
daily operation" on page 87).
Procedure
• Unlock the Emergency Disconnect switch (84)
to do this
• Press the rocker in (s) and pull it up until you
feel the Emergency Disconnect switch
engaging.
• Insert the key in the key switch (82) and turn it clockwise as far as it will go to the
"I" position.
• Test the brake pedal and parking brake.
The truck is now ready for operation. The display (104) shows the remaining battery
capacity.
Z
When you have pulled the EMERGENCY DISCONNECT and turned the key switch
to the right, the truck carries out a self test for approx. 3-4 seconds (tests the
controllers and motors). During this time the truck cannot move or lift. If the
accelerator or a lift mechanism lever is applied during this time, an information
message will be displayed.
82
104
84
97

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis