Herunterladen Inhalt Inhalt Diese Seite drucken

Space Requirement For Transport And Installation (Crane Operator, Industrial Truck Driver) - Bosch BPT-C 200 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
38 | Installation location
Without raised floor
BPT-C 200, 300, 350 | Operating manual
1390
4.3:
Aerial view of the device with doors open (dimensions of device in mm)
Note the following during installation:
Doors must be able to be opened to 180°
Dimensions of the device
Note the following for installation directly on the floor (without raised
floor):
Remove the base panels and, if necessary, replace them with base panels
with a protective screen
Clearance at the side: At least 200 mm
The way in which the device is set up can cause an additional workload
during servicing or maintenance. Access to some components is made
easier through the use of a raised floor. Take this into account when
planning the system and any service contracts.
4.2.3
Space requirement for transport and installation (crane operator,
industrial truck driver)
The transport route must be designed accordingly and must be able to
support the weight of the device, the wheel pressure and the weight of the
crane or industrial truck.
The means of transport must meet the following requirements:
Designed for the maximum weight of the device
Satisfies the requirements of the installation site
The space requirement for installation depends on local and project-
specific factors.
If you are transporting the device with the crane, note the following:
Space requirement > half the support width of the crane + 1 m safe
distance to the foundation pit + 1 m working area around the foundation
pit + half the width of the device
The foundation pit is the gap in the raised floor or the recess in the floor
1600
1790
Bosch Power Tec GmbH
English

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bpt-c 300Bpt-c 350

Inhaltsverzeichnis