Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
English
Bosch Power Tec GmbH
[2]
Information area
[3]
Task bar
Additional buttons
Button
Function
Back to the start page
Calls up the help page
Returns to the previous page
Edit input
Calls up the Settings submenu
Calls up the submenu for setting the display language.
Calls up the submenu for setting the time zone, the time and the date of
the display.
Calls up the submenu for setting the grid standard and the country of use
for the photovoltaic system. If you do not set the grid standard, the
device cannot be operated.
During commissioning of the central inverter, set the correct time zone, the
time and the date in the display.
Please note the following here:
These settings have an effect on various menu items (e.g. diagram views,
event log entries).
When Internet access is available, the time and date are automatically
synchronised.
3.5

Interfaces

Each device has the following interfaces:
CAN
USB
Ethernet
When designing the earthing line and material to be used, local standards,
guidelines and circumstances must all be taken into account.
Since photovoltaic systems are often set up in very dry regions, the
manufacturer recommends using a sufficiently long underground earthing
line. The length of the earthing line depends on the properties of the ground
and is project-specific.
Technical description | 29
BPT-C 200, 300, 350 | Operating manual

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Bpt-c 300Bpt-c 350

Inhaltsverzeichnis