Herunterladen Inhalt Inhalt Diese Seite drucken

Ottobock 3R80 Gebrauchsanweisung Seite 26

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Installing the Prosthetic Foot
>
Recommended tools and materials:
710D4 Torque Wrench, 636K13 Loctite®
1) Position the pyramid receiver of the tube adapter on the pyramid adapter of the prosthetic
foot.
2) For final assembly:
Use Loctite® to secure the set screws of the pyramid receiver.
3) Screw in the set screws.
4) Use the torque wrench to tighten the set screws (10 Nm).
5) Replace any set screws that are protruding or recessed too much with suitable ones (see
selection table).
6) For final assembly:
Use the torque wrench to retighten the set screws (15 Nm).
Reference number
506G3=M8X12-V
506G3=M8X14
506G3=M8X16
5.3.4 Determining Socket Flexion
Required measuring equipment and materials:
>
662M4 Goniometer, Pin
1) On the lateral side of the residual limb, mark the course of the thigh bone.
2) With the patient lying down, instruct the patient to fully bend the contralateral leg and hold it
with the hands.
3) Slide the flat hand
4) Bring the residual limb to full flexion.
5) Slowly move the residual limb in the extension direction until pressure on the hand is reduced.
6) Slowly move the residual limb back in the flexion direction until the pressure reduction stops.
7) In this residual limb position, measure the angle α (hip flexion contracture) with the goniomet­
er.
8) INFORMATION: Correct socket flexion (β) during bench alignment is crucial for optim­
um walking. Take the individual situation of the patient into account for the tolerance.
If the angle α = 0°, the optimum value of the angle β = 3 to 5° to the alignment reference line.
If the angle α > 0°, the optimum value of the angle β = α + 5 to 10°.
5.3.5 Determining the Socket Reference Point
Required measuring equipment and materials:
>
743A80 50:50 Gauge, Pin
1) Position the 50:50 gauge on the lateral side of the prosthetic socket in the distal area and
mark a centre point
2) Position the 50:50 gauge in the proximal area and mark a centre point
3) Using these points, mark the centre line of the prosthetic socket.
4) Clearly mark the tuberosity height as the tuberosity reference point
5) Clearly mark the socket reference point
26 | Ottobock
Selection table for set screws
Reference number (titanium)
506G5=M8X12
506G5=M8X14
506G5=M8X16
under the patient's back (see fig. 3).
(see fig. 5).
Length (mm)
12
14
16
30 mm proximal to the tuberosity reference point.
.
on the centre line.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

3r80-st

Inhaltsverzeichnis