REPLACING FIRE BARRIER
Tools Required:
• Diagonal Pliers
• Utility Knife
• Zip Tie Gun
Procedure:
1 .
Raise the bed height to the full up position .
2 .
Lower the fowler and gatch sections to the full down positions .
3 .
Unzip the cover . Start at the foot end patient right corner of the support surface and stop at the head end patient
right corner .
4 .
Fold the top of the cover to the patient's right side .
5 .
Using diagonal pliers, carefully cut the cable tie closest to the foot end of the mattress cover securing the low air
loss hose and reduction coupler fitting to the valve body (See Figure 3 on page 20) .
Note: Use caution not to damage the flame barrier .
6 .
Remove the reduction coupler fitting from the valve body .
7 .
Starting at the foot end, roll up the fire barrier on the foam crib assembly .
Note: Work from side to side a little at a time to get the fire barrier to the top .
8 .
Discard the old fire barrier, per hospital protocol .
9 .
Starting at the head end, roll the new fire barrier up and slide it over the foam crib assembly .
Note: Square the fire barrier on the foam crib before sliding it too far over the foam crib assembly .
10 . Carefully slide the fire barrier down the foam crib assembly, working side to side to make sure the fire barrier is tight
on the foam crib assembly .
11 . Carefully adjust the foam crib assembly on top of the bottom part of the cover so it is square with the cover .
12 . Locate the LAL tubing and, using a utility knife, cut a hole through the fire barrier to ensure the connection point for
the hose is not obstructed .
Note: Spread the excess fire barrier material equally below the foam crib assembly at the foot end .
13 . Install the reduction coupler fitting by pushing firmly until it is fully seated into the valve body (See Figure 4 on
page 20) .
Note: Verify the flame barrier is tight around the hose assembly .
14 . Using a zip tie gun, install the supplied cable tie around the valve body, centered on the reduction coupler fitting
(See Figure 4 on page 20) .
15 . Fold the top cover over the top of the foam crib assembly to ensure that it is square with the foam crib assembly .
16 . Zip the cover to close . Start at the head end patient right corner and stop at the foot end patient right corner .
17 . Verify proper operation of the unit before returning it to service .