Herunterladen Inhalt Inhalt Diese Seite drucken

Suzuki VZ1600K4 Montageanleitung Seite 7

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

A. Front Master Cylinder
B. Punched Mark
C. Clamp
D. Bolts
E. Harness
F. Front Brake Light Switch
G. Connectors and Dust Covers
Tighten the upper clamp bolt first, and then
the lower clamp bolt.
Torque: 8.8 N·m (0.9 kgf·m, 78 in·lb)
Left Switch Housing
Fit the two halves of the left switch housing
together so that the vertical parting line of the
front and rear halves align with the punched
mark on the handlebar.
A. Punched Mark
B. Rear Half (Left Switch Housing)
C. Front Half
D. Screws (L = 25)
E. Harness
Insert the two screws (D = 5, L = 25) and
tighten them securely.
Clutch Master Cylinder
Apply silicone grease or PBC grease to the
master cylinder clamp bolts.
Connect the connector of the left switch hous-
ing to the starter lock-out switch on the master
cylinder.
Install the clutch master cylinder with its
clamp and the two socket bolts (D = 6, L =
20).
Position the master cylinder so that the ver-
tical parting line of the front and rear master
cylinder clamps align with the punched mark
on the handlebar.
A. Clamp
B. Clutch Master Cylinder
C. Punched Mark
D. Connector and Dust Cover
E. Starter Lock-out Switch
F. Harness
G. Bolts
Tighten the upper clamp bolt first, and then
the lower clamp bolt to the specified torque.
Torque: 9.8 N·m (1.0 kgf·m, 87 in·lb)
Push the small plastic plugs (4) into both mas-
ter cylinder clamp bolts.
A. Plastic Plugs
- 5 -
B. Master Cylinder

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis