Herunterladen Inhalt Inhalt Diese Seite drucken

Suzuki VZ1600K4 Montageanleitung Seite 6

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

A. Handlebar
Throttle Grip and Right
Switch Housing
Alignment Pin Type
Apply a light coat of grease on the exposed
portion of the throttle inner cables.
Slide the throttle grip onto the handlebar, and
fit both throttle cable tips into the nearest
socket in the grip.
A. Front Half (Right Switch Housing)
B. Throttle Cable (Accelerator)
C. Cable Tips: Apply Grease.
D. Throttle Grip
E. Throttle Cable (Decelerator)
Fit the two halves of the switch housing so
that the pin on the front half fits into the hole
in the handlebar.
B. Nuts
A. Front Half
B. Pin
Insert the two screws (D = 5, L = 25) and
tighten them.
Tighten the holder screw.
Check that the throttle grip moves smoothly
from full open to close, and the throttle closes
quickly and completely.
A. Right Switch Housing
B. Screws (L = 25)
C. Harness
D. Throttle Cable (Accelerator)
E. Throttle Cable (Decelerator)
F. Holder Screw
Front Brake Master Cylinder
Apply silicone grease or PBC grease to the
master cylinder clamp bolts.
Connect the right switch housing lead con-
nectors to the front brake light switch termi-
nals on the front brake master cylinder.
Install the front master cylinder with its clamp
and the two socket bolts (D = 6, L = 20).
Position the master cylinder so that the ver-
tical parting line of the front and rear master
cylinder clamps align with punched mark on
the handlebar.
- 4 -
C. Hole
D. Throttle Grip

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis