Herunterladen Inhalt Inhalt Diese Seite drucken

ECOLAB Inspexx S Betriebsanleitung Seite 240

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Maintenance
Mount the metering unit on the pump.
6.
Empty metering pump
Fig. 12: Empty metering pump
Protective equipment:
Close the water supply.
1.
Remove the metering part.
2.
Remove the pump cover and the motor.
3.
Disconnect the connection pieces from the water inlet and outlet.
4.
Remove the pump body from the wall bracket and empty it.
5.
Clean the seal
6.
MAN048969, Ver. 5-05.2024
1
Chemical-resistant protective gloves
n
Protective goggles
n
Safety shoes
n
before reassembly.
1
64
Seal
1
Inhaltsverzeichnis
loading

Inhaltsverzeichnis