Herunterladen Inhalt Inhalt Diese Seite drucken

Protective Equipment - Ecolab Inspexx S Betriebsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

1
2
3
4
5
Fig. 5: station station
Main tap
1
Media input
2
Media outlet
3
Sampling tap
4

Protective equipment:

Install the main tap
1.
Connect the supply line to the main tap.
2.
Connect the sampling hose
3.
Connect the suction hose to the concentrate port
4.
suction hose to concentrate port' on page 36
Connect the PVC overflow hose
5.
and guide it into a drain hopper.
For initial commissioning, connect a hose to the media outlet
6.
drainage system or into a sufficiently large collection vessel.
6
Protective work clothing
n
Protective gloves
n
Safety shoes
n
Protective eyewear
n
at the media supply
1
to the sampling cock
5
to the overflow port
7
35
Installation and assembly
7
Sampling hose
5
Concentrate connection
6
PVC overflow hose
7
Overflow connection
8
on the station.
2
.
4
.
Ä Chapter 5.6 'Connect
6
on the backflow preventer
8
and guide it into the
3
MAN048969, Ver. 5-05.2024
8
Inhaltsverzeichnis
loading

Inhaltsverzeichnis