Increase the dosage of the metering pump to 0.9%, see
5.
dosage' on page 44 .
Open the water supply and flush the station for at least 5 minutes.
6.
Close the water supply.
7.
9.3
Complete service
To ensure proper operation of the station, maintenance must be completed properly.
Protective equipment:
Check all screw connections for a secure fit.
1.
Check the station for tightness, see
2.
on page 45 .
Connect the metering line to the consumers.
3.
Set the metering pump to the initial value, see
4.
on page 44 .
Reconnect the station to the disinfectant supply.
5.
the disinfectant supply' on page 46
9.4
Maintenance intervals
Interval
Prior to each use
Every 2 months
Half-yearly
Semi-annually
Safety shoes
n
Chemical-resistant protective gloves
n
Protective goggles
n
Maintenance work
station
check the components for tightness
n
Check setting of pressure controller (max. water pressure 6 bar)
n
Check the station for leaks
n
Fine filter
Rinse filter
Ä 'Rinse filter' on page 58
n
Ä More information on: Fine filter MiniPlus FF06
Fine filter
Clean the fine filter
Ä 'Clean or replace the fine filter'
n
on page 59
Ä More information on: Fine filter MiniPlus FF06
Suction lance
Check functionality
n
Check for leaks
n
Backflow preventer
Check inlet backflow preventer
n
Check drain valve
n
Proportional dosing unit
Replace all seals made from Viton
n
Ä Chapter 7.6 'Set the
Ä Chapter 7.7 'Check station for leaks'
Ä Chapter 7.6 'Set the dosage'
Ä Chapter 7.8 'Connect station to
57
Maintenance
Personnel
Operator
Operator
Operator
Specialist
Service personnel
Specialist
MAN048969, Ver. 5-05.2024