Installation and assembly
Wall condition
When mounting station a wall, make sure that the wall can permanently bear the weight of
the station . For information on weight see
Space requirements
Comply with the minimum space required for the station.
Fig. 3: Space required by the station (in mm)
5.3
Connections required on site (provided by the customer)
WARNING!
Danger due to improperly installed system components
Improperly installed system components can result in personal injury and
damage to the system.
– Check that the system components provided (pipe joints, flanges) have
been installed correctly.
– If assembly has not been performed by Customer Service or another
authorised party, check that all system components are made of the correct
materials and meet the requirements.
NOTICE!
Non-compliance with operating conditions risks damage to components
The station must always be operated within the operating conditions allowed
for. In particular, this relates to ambient and media temperatures.
12 'Technical data' on page 76
Before installation, the supply connections needed on site must be provided.
12 'Technical data' on page 76 .
To commission the station, and also for bleeding and flushing, a connection to
the drains should be provided.
This can take the form of a drainage hopper below the sampling hose.
At the transition from plastic to stainless steel pipes, the use of compensators
is recommended in order to minimise mechanical stress during installation and
operation.