Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Initial Start-Up; Switch-On; Fig. 22: Power Switch With Female Connector At The Rear Panel - Knauer Azura DAD 2.1L Benutzerhandbuch

Vorschau ausblenden Andere Handbücher für Azura DAD 2.1L:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operation

Prerequisite
Procedure
Result
Next steps
KNAUER
31
Operation
In this chapter, you find information relevant for operating the
detector.

Initial Start-Up

Use this checklist to determine whether the detector is ready for
the initial start-up:
Devices is positioned in the correct location.
The power plug has been pulled.
If the device is part of an HPLC system, you should also note the
following:
The network connection to the router is established.
The chromatography software has been installed by KNAUER
or a company authorized by KNAUER.
A flow cell has been installed.
The capillaries have been connected.

Switch-On

The installation has been completed.
The flow cell or test cell has been inserted.
CAUTION! 
Possible damage to the device caused by con-
densed water!
Allow device to acclimate for 3 h, before it is con-
nected to power supply and taken into operation.
Process
1. On the rear of the
device, plug the power
cable into the power
connector
2
2. Plug in the power sup-
ply.
3. On the rear of the
device, switch on the
detector using the
power switch
The detector starts its self-validation. If the self-validation has
been successfully completed, the LED on the right and in the
center light up green.
Bring the detector into service.
DAD 6.1L, DAD 2.1L, MWD 2.1L User Manual V6700, Version 1.0
Figure
.
Fig. 22
.
1
1
2
Power switch with
female connector at the
rear panel

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Azura mwd 2.1l

Inhaltsverzeichnis