Herunterladen Inhalt Inhalt Diese Seite drucken

Wiring The Pin Header; Fig. 20 Spring Strip - Knauer Azura DAD 2.1L Benutzerhandbuch

Vorschau ausblenden Andere Handbücher für Azura DAD 2.1L:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

28
Installation

Wiring the Pin Header

To control one device through another, you use the pin header.
The single ports are used to exchange control signals.
To use remote control, you have to connect cables to the pin
header. Therefore, connect the cables firstly to the spring strip
and push the spring contacts of the spring strip secondly onto
the pins of the pin header.
Prerequisites
The device has been turned off.
The power plug has been pulled.
Tools
Depressor tool
Procedure
Process
1. Place the spring strip
on a suitable surface.
2. Push the depressor tool
into the opening on the
spring strip.
3. Continue pushing the
depressor tool down and
lead the cable
front end of the spring
strip.
4. Remove the depressor
tool.
5. Check whether the cables
are tightly attached.
6. Plug the spring strip onto
the pin header.
Next steps
Finish the installation and perform the initial startup.
KNAUER
DAD 6.1L, DAD 2.1L, MWD 2.1L User Manual V6700, Version 1.0
CAUTION! 
Short-circuit hazard. 
Turn off the device before connecting it to the
pin header. Pull the power plug.
CAUTION! 
Electrostatic discharge can destroy the electronics! 
Wear protective bracelet against electrostatic dis-
charge and ground.
Figure
3
1
into the
2
Fig. 20
1
2
3
Spring strip

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Azura mwd 2.1l

Inhaltsverzeichnis