Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The Leak Management - Knauer Azura DAD 2.1L Benutzerhandbuch

Vorschau ausblenden Andere Handbücher für Azura DAD 2.1L:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

21
Installation

Connecting the Leak Management

The leak management consists of the leak sensor and the drain-
age system. The drainage system ensures that escaping liquids
flow into a waste bottle. If there is too much liquid, the red LED
starts flashing. Both the device and the data acquisition via chro-
matography software are stopped.
Prerequisite
The front cover has been removed.
Procedure
Process
1. Carefully push the fun-
nel
opening of the capillary
guide
2. Push the long ending of
the first nozzle
the hose
3. Connect the nozzle and
the funnel.
4. Push the other end of
the hose onto the noz-
zle
KNAUER
DAD 6.1L, DAD 2.1L, MWD 2.1L User Manual V6700, Version 1.0
into the center
1
.
2
into
4
.
3
of the leak tray.
5
Figure
1
2
Fig. 12
Funnel and capillary
guide
Fig. 13
Hose and nozzle
Fig. 14
Hose connected to
device
3
4
5

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Azura mwd 2.1l

Inhaltsverzeichnis