Herunterladen Diese Seite drucken

coldline VISION W5S Bedienungs- Und Wartungsanleitungen Seite 48

Vorschau ausblenden Andere Handbücher für VISION W5S:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 76
3.0
INSTALLATION
3.1 INTRODUCTION
The Manufacturer declines all responsibility in the event of improper use of the appliance.
Installation must be carried out by specialized technical personnel only.
The appliance must be installed by specialized personnel according to the instructions in this manual. The
execution of remote systems, electrical and water connections must be accompanied by the relative
declaration of conformity issued by the installer.
3.2 HANDLING
Handle the packed appliance using a forklift or a hand pallet truck, with fork length equal to the length of the
pallet and an adequate load capacity for the weight of the unit.
3.3 REMOVING THE PACKAGING
Depending on the type of packaging, pull the cardboard up or remove the planks of the wooden cage with a
screwdriver. Use protective gloves to avoid contact with splinters of wood. Do not release the packaging to
the environment and dispose of it as required by local regulations.
3.4
INTEGRITY
Check all parts of the appliance for damage and that the standard-issue accessories provided inside are as
expected.
3.5
POSITIONING
Carry the appliance on its pallet using the relevant truck and move it to the installation site. During
positioning, tilt the appliance only if strictly necessary making sure the tilt angle does not exceed 60°.
Remove the 4 screws that hold the body anchored to the pallet, screw the 4 feet releasing one corner at a
time from the pallet.
3.6
LEVELLING
Move the appliance into its final position and adjust the screw-type feet until the unit is perfectly level.
3.7
CLEANING
Remove the PVC film covering the inside and outside of the appliance. Clean the compartment inside using a
sponge damp with lukewarm water.
3.8
WORKING CONDITIONS
Make sure the room in which the appliance is installed meets the following conditions:
• Ambient temperature between 5°C and 40°C and 40% humidity.
• Positioning away from sources of heat and in a well ventilated area.
In blast chillers, leave at least 10 cm at the rear in order to properly dissipate the heat produced, in the
cabinets do not place boxes or trays on the technical compartment of the cabinets, and do not set the
cabinets inside niches. Incorrect evacuation of the condenser heat can cause serious malfunctions and
significantly increase the consumption of the appliances.
3.9
COMMISSIONING
Before connecting the appliance to the power mains, make sure that:
• Voltage and frequency comply with the working conditions featured on the CE plate inside the appliance:
maximum tolerance is ± 10% of the rated value.
• The power supply circuit meets the regulations in force.
• The electrical system is fitted with a circuit breaker (r.c.d.).
• With devices equipped with a humidification system, a filtering system for the supply water of the humidifier
is provided, consisting of a head and a replaceable filter cartridge.
48

Werbung

loading