sound pressure level L
pA
uncertainty K
pA
sound power level L
WA
uncertainty K
WA
Wear hearing protection.
The effects of noise can cause a loss of hearing.
Total vibration values (vector sum - three directions)
determined in accordance with EN 61029.
7. Before starting the equipment
• The equipment must be set up where it can stand
securely, i.e. it should be bolted to a workbench, a
universal base frame or similar.
• All covers and safety devices have to be properly
fitted before the equipment is switched on.
• It must be possible for the blade to run freely.
• When working with wood that has been processed
before, watch out for foreign bodies such as nails
or screws, etc.
• Before you press the ON/OFF switch check that the
saw blade is fitted correctly. Moving parts must run
smoothly.
• Before you connect the equipment to the power
supply make sure the data on the rating plate are
dentical to the mains data.
• Connect the machine to a properly installed pro-
tective contact socket, with at least 16A circuit
breaker.
8. Attachment
Important. Pull out the power plug before carry-
ing out any maintenance, resetting or assembly
work on the circular saw!
Place all parts supplied on a flat surface. Grouping
equal parts.
Note: If compounds with a bolt (round head / or hexa-
gon), hex nuts and washers are backed up, the wash-
er must be fitted under the nut.
Insert screws each from outside to inside. Secure
connections with nuts on the inside.
Note: Tighten the nuts and bolts during assembly
only to the extent that they can not fall down.
If you tighten the nuts and bolts prior to final assem-
bly, final assembly can not be performed.
8.1 Frame assembly, Fig. 5-7
1. Fix the four legs (17) with the bolts (g) and nuts (h)
to the struts (20+21).
m Warning!
The top struts are equipped with a slot for fixing
them to the table!
30 | GB
www.scheppach.com / service@scheppach.com / +(49)-08223-4002-99 / +(49)-08223-4002-58
92,6 dB(A)
3 dB
2. Now loosely fix the lower struts to the legs using
105,6 dB(A)
3 dB
3. Now place the rubber feet (22) on the legs (Fig. 6).
4. Then mount the entire saw on the frame by fix-
5. Afterwards, tighten all bolts and nuts to the frame.
8.2 Hand wheel assembly, Fig. 8
1. Place the washer (e) on the bolt (a).
2. Then place the bolt on the handle (b) and the
3. Fix the whole assembly to the hand wheel (8) and
8.3 Riving knife set-up (Fig. 9-11)
m Warning!
The set-up of the riving knife (4) must be checked
before each use.
1. Set the saw blade (5) to the max. cutting depth,
2.
3. Loosen the locking handle (23) and push the riv-
4. The gap between the saw blade (5) and the riving
5. Re-tighten the mounting screw (23) and fix the ta-
8.4 Saw blade guard assembly (Fig. 12)
1. Place the saw blade guard (2) including the bolt
2. Do not tighten the bolt (24) too much; the saw
3. Place the extraction hose (3) on the extraction
4. Disassembly takes place in reverse order.
8.5 Saw blade assembly/replacement
(Fig. 9, 12, 13)
1. Warning! Disconnect the mains supply and
2. Disassemble the saw blade guard (2) (Fig. 12).
3. Remove the table insert (6) (Fig. 9).
Ensure that markings A and B are always oppo-
site each other.
the bolts (g) and nuts (h) (Fig. 5).
ing the hexagon head bolts and the nuts in the
corners (Fig. 7).
washer (c) on the bolt.
secure it with the hex-nut (d).
Disconnect
the
put it in the 0° position and lock it. .
Remove the table insert (6) (Fig. 9)
m Warning! For transport reasons, the riving
knife (4) was fixed in the lower position before
initial commissioning. Only work with the ma-
chine if the riving knife (4) is in the upper po-
sition. Fitting the riving knife (4) in the upper
position is as follows:
ing knife (4) in the upper position (Fig. 10).
knife (4) should be a maximum of 5 mm (Fig. 11).
ble insert (6).
(24) on the riving knife (4) from above so that the
bolt is tight in the slot of the riving knife (4).
blade guard (2) must be able to move freely.
adapter on the rear of the machine and on the ex-
traction nozzle of the saw blade guard (2).
Warning!
Before starting to saw, lower the saw blade
guard (2) on to the work piece.
wear safety gloves.
mains
cable!