Herunterladen Diese Seite drucken

Novoferm iso20-4 Montage-, Bedienungs- Und Wartungsanleitung Seite 13

Zugfeder

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
GB
( 30 ) Installing finger protection:
Valid for all types and designs:
Carefully insert finger protection 20 into the area shown
[1.70b].
( 31 ) Adjusting the upper roller:
( 31a ) when operating by hand and with NovoPort:
The centre of the roller must dip approx. 5 mm into
the moulded end piece 16
( 31b ) when operating by ceiling pull:
The roller must lie in the upper radius of the moulded
end piece 16
[1.70d, da].
R/L
OPTIONAL
-------------------------------------------------------------------------------------
If frames or panel seals are misshapen, they can be restored to
their original shape with, e.g., a hot air gun.
Caution: Do not overheat seals!
-------------------------------------------------------------------------------------
Standard installation without floor profile
"Reno" installation – example
( 32 ) Activation of "RENO" installation – example.
Activation is dependent on:
A distance of about 60mm between the side border and the
existing front track
[2.10a].
along the line indicated
protruding strap on the frame
Important: Protect the cut against corrosion. (Touch-up
paint not included in the scope of delivery.)
Position the frames in the space between wall and floor
track
and continue as described from Assembly of
[2.10e]
the door frame
[1.15].
Keep these installation, operating, and maintenance instructions in a safe place during the entire service life of the garage
[1.70d, da].
R/L
[1.60].
[2.05]
Bend the lower base bracket
Either fold over or cut off the
[2.10b].
[2.10c,d].
Test instructions
All parts must be assembled as described in the installation
instructions to assure the functional reliability, durability and
smooth operation of the sectional garage door. If the sectional
garage door still does not function properly, please check the
following points:
( 33 ) Are the side angular frames, frame panel and horizontal
tracks exactly aligned horizontally, vertically and diagonally,
and securely fastened?
( 34 ) Are all screw connections tight?
( 35 ) Have the transitions between the vertical tracks in the an-
gular frame and the 89° arcs been adjusted (see section
8)?
( 36 ) Check the spring tension: open the door halfway. The door
must hold in this position without help.
( 37 ) If the door sinks noticeably, increase the spring tension as
described in section 24.
( 38 ) If the door rises noticeably, lower the spring tension as de-
scribed in section 24.
( 39 ) Are the spring pins inserted in the lower spring mounts and
in the tightening strap?
( 40 ) Rollers: can all the rollers be easily turned by hand when
the door is closed (see sections 18+29)?
( 41 ) Has the upper roller been correctly adjusted (see section
31a,b)?
( 42 ) When the door is open, do all roller axes extend the same
distance out of their holders?  Diagonal testing
( 43 ) Are the double cables positioned exactly in their guides,
and not twisted?
( 44 ) Doors with operators: has the locking mechanism been
dismantled?
( 45 ) For NovoPort: Check the clearance opposite the operator
between the door leaf and the guide. Bend the contact sur-
face.
Dismantling instructions for sectional garage
doors
iso20-4 / iso45-4 with vertical tension spring
- Dismantling by qualified installers only -
Please read these instructions carefully prior to disassem-
bly.
The following tools are required for disassembly:
SW 7, 10 and 13 open-end or socket wrench, reversible ratchet
with extension and SW 7, 10 and 13 spanners, Phillips screw-
driver size 2, T30 screwdriver bit, at least 2 screw clamps, pos-
sibly a hammer.
( 46 ) Removing the tension springs
Caution: Wear suitable personal protective equipment
when removing the tension springs and secure the door
leaf against falling down!
Move the door leaf to its end position and secure against its
falling down. Remove the single cables from the lower cable
link on the left and right sides.
( 47 ) Close the door slowly and carefully.
( 48 ) Beginning with the top section, dismantle each section in
the reverse sequence to installation.
( 49 ) Continue dismantling the door in reverse order as de-
scribed in the installation instructions.
door!
- 10 -
[1.30d + 1.30Diagonalmeßung]

Werbung

loading

Diese Anleitung auch für:

Iso45-4