IMI PNEUMATEX ComCube Montageanleitung Seite 62

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Start-up
de
fr
en
We recommend having the start-up carried out by the nearest Pneumatex Customer Service. This must be ordered separately,
and will be at the price specified in the Zoom for the country concerned. The scope of service is as described in this chapter.
nl
Requirements
• The services described in the «Installation» section have been completed.
• The electrical power supply is available
• The BrainCube control is switched on.
ComCube DCA - BrainCube with ComCube DCA | DCA TI
Switching on: For ComCube DCA, connect the mains plug (1.2), or for ComCube DCA TI, switch on the main switch on the
Transfero TI,.if all requirements for start-up are fulfilled, all settings have been made, and the ComCube DCA is to go into
operation. No other steps are required for start-up.
Output calculations: For the building management system, PIS pressure and LIS content can be made available as
galvanically isolated 4 – 20 mA signals through ComCube DCA | DCA TI (:
must not be made on the BrainCube. The PIS and LIS 4 – 20 mA signals are calculated by the customer. This must take the
meter range as well as the scaling per analogue input into account.
Sensors used
PIS pressure
Compresso CPV
Compresso C 10 | 20
Transfero T_ 4 | 6 | 8 | 10
Transfero TI 100.2 | 61.2 | 91.2 | 62.2 | 82.2 | 53.2 | 93.2
Transfero TI 120.2 | 150.2 | 111.2 | 141.2 | 112.2 | 152.2 | 113.2 | 143.2
Transfero TI 190.2 | 230.2 | 181.2 | 241.2 | 152.2 | 192.2 | 173.2
Pleno PI 6.1 | PI 6.2 | PI 9.1
Vento (all types)
LIS content
Expansion vessels up to 1,000 litre
Expansion vessels from 1,000 to 5,000 litres
Expansion vessels from 5,000 to 20,000 litres
The LIS signal at 0% and 100% can be determined in the following ways:
• R ead off the mA values stored in the BrainCube for 0% or 100% (service level performed by Pneumatex Customer Service
only, at a cost).
• Measure the mA signals when the primary vessel is empty (0%) and when full (100%).
• M easure the mA signal with the primary vessel empty (0%), calculate the mA signal for 100% according to the size of the
primary vessel, and assuming that weight is distributed equally between the three feet of the vessel (: 1 litre ≈ 0.33 kg/foot).
ComCube DCD - BrainCube with ComCube DCD | DCD TI
Switching on: For ComCube DCD, connect the mains plug (1.2), or for ComCube DCD TI, switch on the main switch on
the Transfero TI. ComCube DCD | DCD TI is ready for start-up. BrainCube Software Version V2.00 or higher is required. If
necessary, have a software update performed by Pneumatex Customer Service (this service is payable). At the initial start-up,
it displays a «Welcome» message (if there is no operator action for 4 min., it automatically changes to standby with display
function only, then to the menu.
62
electrical connection page 59). Parameter settings
Measurement range
-1–10 bar
0–10 bar
0–10 bar
0–10 bar
0–16 bar
0–25 bar
0–10 bar
-1–10 bar
0–500 kg
0–2,000 kg
0–8,000 kg
Output
4 – 20 mA
4 – 20 mA
4 – 20 mA
4 – 20 mA
4 – 20 mA
4 – 20 mA
4 – 20 mA
4 – 20 mA
4 – 20 mA
4 – 20 mA
4 – 20 mA