Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

R
600 XT PRO
OTEX
20

1.3.1 Assembly

Slide the equipment off the pallet onto the
floor in the position where it is to be installed.
Remove the guards from the control panel
column by unscrewing the 6 screws.
Position the central riser on the frame at the
level of the 4 drilled holes and secure it with
4 M10x20 screws. Tighten completely.
144rotex
Install the side handgrips on the central riser
M8x16
and secure them with 4 screws M8x16 and
2 screws M8x20. You have to apply gentle
pressure to push the ends of the handgrips
all the way into their holes.
144-1
Rest the upper handgrip against the side
handgrips, as illustrated in the figure.
01328008

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis