Installation checklist
14
Installation checklist
The metering system is state-of-the-art on delivery. In order to be eligible for complete CE
marking, some requirements apply to installing and using this system.
To help you meet these requirements, they are summarised in an installation checklist.
General data
Customer name:
ELADOS Pump Rack
Production code:
Date of installation:
Address:
Tel:
Ecolab field rep:
ECOLAB technician:
Contact:
Additional Notes
Water supply
Checklist
Backflow preventer required and installed?
Shut-off device available between the water supply and the
water valve?
Dynamic water pressure of at least 2 bar available?
Maximum water temperature of 30° C?
Additional Notes
417102267 Ver. 04-11.2023
Fax:
90
Device number:
E-mail:
Yes
No
Comment
o
o
o
o
o
o
o
o