Herunterladen Inhalt Inhalt Diese Seite drucken

5.7.5.1 Assembly Water Flushing - Ecolab Elados Pump Rack Betriebsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

5.7.5.1 Assembly water flushing

4
13
10
Fig. 12: Assembly water flushing
1
Pipe clamp
2
Screw
3
Insert part G ½
4
Male coupling
5
Union nut
6
PVC braided hose 10 x 3
7
Male coupling
1.
Remove the output side male stud coupling (item 10) from the 3-way valve.
2.
Align the pipe clamp (item 1 ) in the existing hole with the screw (item 2), and fasten.
3.
Place the flushing assembly (item 13) on the insert part G ½ (item 3) and hand
tighten with a union nut (5) to secure.
4.
Push the PVC braided hose 10 x 3 (item 6) onto the stud of the male stud coupling
(item 7) as far as it will go, and then tighten the union nut.
5.
Connect the PVC braided hose to the free hose bushing on the flushing valve block
(item 8), and then secure with a hose clip (item 9).
6.
Pipe connection procedure:
2
1
9
7
6
5
3
CAUTION!
Counter the male stud coupling with a flat spanner at the same time to
avoid exceeding the permissible tightening torque!
Ä Chapter 5.7.1 'EMP III pump – 54 l/h' on page 47
11
8
12
11
14
8
Flushing valve block
9
Hose clamp
10 Output side male stud coupling
11
Fastening brackets (2 x)
12 End piece
13 Flushing
14 Fastening screws for fastening brackets (4 x)
51
Installation
417102267 Ver. 04-11.2023
Inhaltsverzeichnis
loading

Inhaltsverzeichnis