Herunterladen Inhalt Inhalt Diese Seite drucken

5.7.11.1 Assembling The Flotation Flowmeter - Ecolab Elados Pump Rack Betriebsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

5.7.11.1 Assembling the flotation flowmeter

Fig. 17: Assembling the flotation flowmeter
1
Pipe clips (2 x)
2
Screws
3
Drill holes
4
Flotation flowmeter
5
Hose clamps
6
Limit sensor
1.
Fasten the pipe clips (no. 1) to the appropriate holes (no. 3) in the bracket using
screws (no. 2).
2.
Press the flotation flowmeter (item 4) into the pipe clips (item 1).
3.
Push on the Tygon 9.5/15.9 or PVC braided hose 10/16 and fasten in place with
hose clamps (item 5).
4.
As a preset, align the limit sensor (item 6) with the centre of the flowmeter (item 4)
and fix in place with screws (item 7).
5.
Route the cable through the hole (item 8) in the bracket to the vertical cable duct
(item 9) and to the terminal box (item 10).
6.
Trim the cable and patch as per the wiring diagram.
CAUTION!
During commissioning, adjust the position of the limit sensor!
7
Screw
8
Drill holes
9
Vertical cable duct
10 Terminal box
11
PVC braided hose
59
Installation
417102267 Ver. 04-11.2023
Inhaltsverzeichnis
loading

Inhaltsverzeichnis