5.7.4.1 Assembling The Product Sampling Valve; Retrofitting Kit For Water Flushing - Ecolab Elados Pump Rack Betriebsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Installation

5.7.4.1 Assembling the product sampling valve

Fig. 11: Assembling the product sampling valve
1.
Assemble both pipe clips (no. 1) with screws (no. 2) in the intended position
( Fig. 11 , arrows) of the ELADOS Pump Rack stand.
2.
Latch the ball valve with connections (no. 3) into the pipe clips, as shown.
3.
Pipes at the pump and output sides:
Cut off the PEX or PTFE pipe at right angles and slightly chamfer the inner edge.
4.
Slide the pipe over the threaded piece as far as it will go and screw in the union nut
Ä Chapter 5.7.1 'EMP III pump – 54 l/h' on page 47 ).
(
5.
During commissioning, check the connections for leak tightness.
5.7.5

Retrofitting kit for water flushing

Figure
417102267 Ver. 04-11.2023
3
CAUTION!
Counter the male stud coupling with a flat spanner at the same time to
avoid exceeding the permissible tightening torque!
Check the connections for leaks when commissioning the pump!
Designation
Material
PP
PVDF
PP
Water flushing
PVDF
Flushing
extension
-
valve double
24 V, DC
1
Pipe clamps
1
2
Screws
2
3
Ball valve with connections
Connection Misuse
Alkaline
products
8 / 12
Acidic products
Turbo emulsion
12 / 16
Acidic products
10 / 16
Water
50
Article no. EBS No.
201531
10025987
201532
10025986
201533
10025989
201549
10025939
201534
10025978