Starting up

Personnel:
6.1

Safety instructions for commissioning

CAUTION!
The following points must always be observed:
– No operation without return flow protection (system separator)!
(see also
on page 71
– The system must not be operated if the splashguard is not in place!
– Adjust or check the position of the limit switch for the variable-area
flowmeter!
– Test the function of the emergency stop switch!
The complete system must be checked for leaks before commissioning:
– First fill the system with water, then check all screw connections for leaks
and tighten if necessary.
– Tighten the pump head screws according to the User Manual.
CAUTION!
The emergency stop switch must be accessible; it may not be blocked or
closed off!
n
Manufacturer
n
Operator
n
Specialist
n
Service personnel
Ä Chapter 9.1 'Optional ELADOS Pump Rack equipment'