Herunterladen Inhalt Inhalt Diese Seite drucken

5.7.7.1 Assembling The Manifold Connection; Pulsation Attenuator - Ecolab Elados Pump Rack Betriebsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

5.7.7.1 Assembling the manifold connection

Fig. 13: Assembling the manifold connection
1
Blanking plug
2
Manifold
3
Non-return valve
1.
Unscrew the blanking plug (item 1) from the manifold (item 2).
2.
Screw the threaded socket (item 4) onto the non-return valve (item 3).
3.
Screw the valve into the manifold (item 2).
4.
Screw the male stud coupling (item 5) into the threaded socket (item 4).
5.
Pipe connection procedure:
5.7.8

Pulsation attenuator

Figure
NOTICE!
Tightening torque: 5 Nm
Check the seat of the O-rings.
WARNING: The valve contains loose components.
Ä Chapter 5.7.1 'EMP III pump – 54 l/h' on page 47
Material
Connection
PP
Size G 5/4
PVDF
4
Thread socket
5
Male coupling
Misuse
Article no.
Alcaline
products
Acidic
products
53
Installation
EBS No.
201535
10025969
201535
10025968
417102267 Ver. 04-11.2023
Inhaltsverzeichnis
loading

Inhaltsverzeichnis