Herunterladen Inhalt Inhalt Diese Seite drucken

Structure Drawing (Specimen View) - Ecolab Elados Pump Rack Betriebsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Functional description
4.2

Structure drawing (specimen view)

Fig. 4: Example: Setup
R
Emergency stop switch
1
Stand
2
Terminal box
3
Container 1 TurboEmulsion
4
*Suction screen suction lance
5
*Low level flotation sensor suction lance
6
*Non-return valve suction lance
7
*Suction lance
8
Overpressure return pumps 1 & 7 (*for all other pumps)
9
*Oval gear meter
10 Variable-area flowmeter (*alternative to 9)
11
Metering pump
12 *Pulsation attenuator
13 *Pressure relief valve
14 Sampling tap
15 Scale (not included in scope of delivery)
16 Non-return valve
* = optional, upgrade components, not included in the standard scope.
417102267 Ver. 04-11.2023
17 Rinsing line
18 Metering connection
19 Flow signal transmitter
20 Rinse valve
21 Flotation flowmeter – water
22 Fresh water inlet
23 Container 2 alkaline
24 Container 3 alkaline
25 *Container 4 alkaline or acidic
26 *Container 5 alkaline or acidic
27 *Container 6 alkaline or acidic
28 Container 7 TurboOxysan
29 Container 8 acidic
30 Container 9 acidic
31 *Metering pumps 4 to 6
32 Drip tray
33 Leak float
34
Inhaltsverzeichnis
loading

Inhaltsverzeichnis