Herunterladen Diese Seite drucken

ECOLAB EcoUp Betriebsanleitung Seite 158

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Maintenance
10.3
Replacing the control unit
DANGER!
Risk of electric shock
Be sure to disconnect the power supply immediately and to secure against
accidental switch-on!
1
Fig. 18: Replace the control unit
Fixing screw
1
Control unit
2
Plug
3
1.
Switch off the pump and disconnect from the mains!
2.
Loosen the screws ( Fig. 18 ,
3.
Lift the control unit up and remove.
4.
Remove both connectors
5.
Insert both connectors into the sockets of the new control unit
6.
Slowly position the new control unit down onto the pump housing
7.
Tighten the fixing screws on the control unit by hand.
MAN049656 Rev. 3-01.2024
2
1
The screws are not secured against falling out!
Make sure they are not lost.
Use only original screws.
from the underside of the control unit.
3
The connectors are "coded" on-site and can thus be inserted into the
sockets only in the correct position.
Two cables that pass control signals to the pump are located between the
pump control unit and the bottom part of the pump.
Ensure that these do not become trapped during the changeover.
There is a seal in the blue pump housing. During assembly, ensure that
the seal is free of contamination to prevent leaks.
The tightening torque for the fixing screws on the control unit is approx.
1 Nm. To prevent damage to the thread, we recommend tightening the
screws by hand.
3
Control unit (new)
4
Pump housing
5
) on the control unit
2
60
4
1
5
.
.
4
.
5

Werbung

loading