Herunterladen Diese Seite drucken

ECOLAB EcoUp Betriebsanleitung Seite 128

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Assembly and connection
Tabletop mounting
1
Fig. 4: Preparations for table mounting
Opening
1
Fixing element
2
On the underside of the mounting plate, the boreholes for countertop mounting
( Fig. 4 ,
Only fixing elements
1.
Turn the mounting plate over
2.
Push the fixing elements from the rear
allow them to engage.
3.
Turn the mounting plate over again and hold it against the required mounting
position.
4.
Using the mounting plate as a template, mark the required boreholes
pencil.
5.
Drill the holes.
6.
When mounting the plate on a stone surface, use suitable dowels and screws to fix
the mounting plate in place.
For table mounting, secure the mounting plate using Ø 5 mm screws.
7.
Place the pump onto the mounting plate.
8.
Push the pump to the back of the mounting plate until the fixing bracket
clicks into place.
9.
10. Attach the connecting lines (hydraulic and electric):
Ä Chapter 6.2.1 'Hydraulic installation' on page 32
Ä Chapter 6.2.2 'Electrical installation' on page 40 .
DANGER!
The mounting plate can be mounted on a suitable container. In this case,
you must not drill new holes to prevent the metering medium from offgassing.
Only containers that have been prefabricated for mounting on pumps using a
threaded insert may be used.
MAN049656 Rev. 3-01.2024
2
) are marked with a 1.
1
with the number 1 may be used for table mounting.
2
To remove the pump from the mounting plate again,
fixing bracket.
3
4
Borehole
3
Fixing bracket
4
into the four openings marked 1
2
30
4
and
1
with a sharp
3
audibly
4
push down on the
4

Werbung

loading