Herunterladen Diese Seite drucken

ECOLAB EcoUp Betriebsanleitung Seite 137

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Pipe connection with weld-on joint
1
2
3
A
1
2
3
A1
Fig. 10: Pipe connection with weld-on joint
Weld-on joint
1
Pipe or hose
2
Union nut
3
O-ring
4
Suction valve, pressure valve
5
1.
Weld the weld-on concentration ( Fig. 10 ,
2.
Place the o-ring
3.
Tighten the
union nuts (for details,
3
4
5
B
3
5
4
B1
in the groove of the suction or pressure valve
4
B1
39
Assembly and connection
Pipe or hose connection (weld-on joint)
A
Weld the weld-on joint
A1
Valve connection
B
Tighten the union nut
B1
) to the hose connection.
1
).
MAN049656 Rev. 3-01.2024
.
5

Werbung

loading