Herunterladen Diese Seite drucken

ECOLAB EcoUp Betriebsanleitung Seite 129

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Wall mounting
1
2
Fig. 5: Preparations for wall mounting
Opening (2)
1
Opening (2)
2
Fixing element (1)
3
On the underside of the mounting plate, the boreholes for wall mounting
( Fig. 5 ,
or
1
For wall mounting, use the fixing elements (supplied) 1
1.
Turn the mounting plate over.
2.
Push the fixing elements marked 2
and allow them to engage.
3.
Push the fixing elements marked 1
, from the rear and allow them to engage.
2
4.
Turn the mounting plate over again and hold it against the required mounting
position.
5.
Using the mounting plate as a template, mark the required boreholes with a sharp
pencil
.
5
6.
Drill the holes.
7.
Fasten the mounting plate securely to the wall.
The hooks of the fixing elements must point upwards.
8.
Place the pump onto the hooks on the mounting plate from above.
9.
Slide the pump downward onto the mounting plate until the fixing tab
with an audible click.
10.
Push down on the fixing tab
plate.
11. Lay the connection cables (hydraulic and electric):
Ä Chapter 6.2.1 'Hydraulic installation' on page 32
Ä Chapter 6.2.2 'Electrical installation' on page 40 .
3
4
6
4
5
6
) are marked with a 2.
2
into the two lower openings
4
into the two lower boreholes marked with a 2
3
to remove the pump from the mounting
6
31
Assembly and connection
5
6
Fixing element (2)
Borehole
Fixing bracket
and 2
3
MAN049656 Rev. 3-01.2024
.
4
, from the rear
1
engages
6

Werbung

loading