Herunterladen Inhalt Inhalt Diese Seite drucken

BD Veritor System Bedienungsanleitung Seite 6

Von clia-auflagen befreites kit zum testen von rachenabstrichproben
Vorschau ausblenden Andere Handbücher für Veritor System:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 31
A
Step 6A: Adding the specimen
Invert the tube and hold the tube vertically (approximately one inch above the labeled
BD Veritor System Strep A device sample well).
Gently squeeze the ridged body of the tube, dispensing three (3) drops of the processed
specimen into the sample well of a labeled BD Veritor System Strep A device.
NOTE: Squeezing the tube too close to the tip may cause leakage.
Step 7A: - Timing development
After adding the sample, allow the test to run for 5 minutes before inserting into the
BD Veritor Instrument.
NOTE: If running test under laminar flow hood or in an area with heavy ventilation, cover test
device to avoid inconsistent flow.
Step 8A: Using the BD Veritor Instrument
During incubation time, turn the BD Veritor Instrument on by pressing the power
button once.
Insert assay device when 5 minute assay development time is complete.
Follow the on-screen prompts to complete the procedure. The status of the assay
analysis process appears in the display window.
Step 9A: Record the Result
• When analysis is complete, the test result appears in the display window.
ATTENTION: TEST Results are NOT maintained in the display window when the device
Using a BD Veritor Reader or Analyzer in "Analyze Now" mode:
is removed or if the Analyzer is left unattended for more than
60 minutes (if the AC power adapter is connected).
6

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis