Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Checking The Installation; Connecting The Power Supply - ABB Sensyflow FMT500-IG Inbetriebnahmeanleitung

Thermischer masse-durchflussmesser
Vorschau ausblenden Andere Handbücher für Sensyflow FMT500-IG:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Commissioning

6
Commissioning
The device may only be started up / opened by qualified operating personnel. The device must
be installed and the electrical signal lines must be connected prior to start-up.
6.1

Checking the installation

Prior to start-up, check that the equipment has been installed correctly:
6.2

Connecting the power supply

Connecting the 115 / 230 V power supply
Step
1.
2.
3.
4.
Connecting the 24 V power supply
Step
1.
2.
3.
WARNING
When connecting the supply power, the information provided below must be observed.
Failure to observe the information provided can result in severe injuries or death.
36 - EN
90
Is the device securely fastened?
Have all the electrical signal, control and interface cables been laid and connected correctly?
Action
Check whether the voltage specified on the name plate matches the line voltage.
Use a supply power line with sufficient dimensions and ratings (circuit breaker).
In the vicinity of the device, install a supply circuit isolator in the power supply
line or a switched socket so that the device can be fully isolated (all poles) from
the power supply. Label the supply circuit isolator to make it clear that it relates
to the equipment that needs to be isolated.
Connect the power cord to the power supply.
Action
Check whether the voltage specified on the name plate matches the line voltage.
Use a supply power line with sufficient dimensions and ratings (circuit breaker).
Connect the supply line to the supply power.
Sensyflow FMT500-IG
CI/FMT500-IG-X1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis