Connecting the Device
Wiring diagram:
PV
PV-
String
String
Battery
storage
L1
Domestic
L2
L3
connection
N
PE
Power meter Phases
L1: yellow
L2: green
L3: red
Proceed as follows for each transducer to attach them
to the outer conductor phases:
• Open the bracket of the transducer (1).
• Place the corresponding outer conductor phase (2)
into the recess inside the current transducer so that the
direction of the arrow on it corresponds to the direction
of the current flow from the inverter to the grid (3).
• Pay attention to the correct sequence according
to the phase sequence (see connection diagram
and corresponding description)!
• Close the bracket (4).
98
PV1
PV2
BATTERY BMS
SPD
MCD
SPD
Inverter
CT
GRID
GENERATOR
MCD
SPD
MCD
Zähler
Meter
PE
BACKUP 1
BACKUP 2
MCD
MCD
RCD
RCD
Supply in island mode
only up to a previously
defined battery level
distribution
Supply in island mode
until batteries are
completely empty
1
4
Loads
Sub-
2
3

Werbung

loading