 Notesonconnection:
• Control the home loads, and make sure their energy de-
mand in EPS mode is within the EPS output rating.
Otherwise the inverter will shut down with the error mes-
sage "Over Load".
• Confirm with the mains grid operator whether there are
any special regulations for the grid connection.
• The wiring diagram is for reference only.
The entire electrical connection must comply with
the requirements of the local regulations.
• Do not misconnect the phase sequence.
Otherwise, the inverter cannot run normally
(error message 30 - "Grid Phase Error").