Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing The Welding Process; Setting The Welding Procedure - Abicor Binzel iROB 501 Originalbetriebsanleitung

Schweißstromquelle
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

®
®
iROB
501, iROB
401, iROB

7.3 Preparing the welding process

 4.2 Control elements on page EN-10
The following setting must be made before the welding process begins:
Check that the welding procedure is suitable for the welding wire material to be welded.
1
 7.2.2 Overview of welding procedures on page EN-27
Set the welding wire material, shielding gas type, and welding speed.
2
Set the welding wire diameter.
3
 7.3.1 Setting the welding procedure on page EN-29
Set the gas pre-flow time.
4
Set the start parameters (welding current and welding voltage).
5
Set the main welding parameters (welding current and welding voltage).
6
Set the end crater filling parameter.
7
Set the gas post-flow time.
8
Save the parameters.
9

7.3.1 Setting the welding procedure

 4.2 Control elements on page EN-10
®
301
Select the desired procedure by pressing the <Welding procedure>
1
selection button.
Select the desired welding wire material by pressing the <Welding wire
2
material> selection button.
Select the desired shielding gas by pressing the <Shielding gas type>
3
selection button.
Select the desired diameter by pressing the <Welding wire diameter>
4
selection button.
P.CONTR.
Press the <Penetration control> button to switch on this function if required.
5
If the LED is on, the iArc mX Speed penetration control function is active.
If the LED is off, the iArc mX Speed penetration control function is inactive.
7 Operation
EN - 29

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Irob 401Irob 301

Inhaltsverzeichnis