Herunterladen Inhalt Inhalt Diese Seite drucken

Rally RE145HCRD Anleitungshandbuch Seite 25

Inhaltsverzeichnis

Werbung

2
1
1. Front bagge
2.
Lower bagger tuba
_q_"
3.
1/4 x 50,8mm Carriage
Bolts
4.
1/4 Lock nut
1.
2.
1/4x 50,8mm Carriage
Bolts
3.
114 Lock nut
4.
Vinyl Binding
5.
Dump handle tuba
6.
Clevis pin
7.
Retainer spdng
6MM (1/4") - 9MM (
1
1.
2.
3.
3
Top Surfaces Even
Honzonts
Vertical Adjustment Bracket
To Assemble
Bagger
NOTE:
For ease of assembly, you may wish to obtain the
assistance of another person when putting the bagger to-
gether.
Holes in front bagger tube are at an angle. Place front
bagger tuba against lower bagger tuba and check for
proper hole alignment before assembling baits.
Assemble front and lower bagger tubas using four (4)
114 x 50,8mm cerfiage
bolts and lock nuts supplied.
Tk:jhten securely.
Slide front and lower bagger tuba assembly into the
bagger assemby.
Assemble front and upper bagger tubas using four (4)
114 x 50,8mm carralge baits and lock nuts supplied.
Tighten securely.
Slip all the vinyl bindings over the bagger tubes
Slide the bagger dump handle through the hole in the
bag.ger top, install the clevis pin and secure with retainer
spnng.
NOTE: For future use, the clevis pin may be removed in order
to use the handle to clear the chute in the event it has become
clogged.
Bagger adjustment
For proper bag function and appearance, it may be neces-
sery to adjust the bagger assembly. There should be 6mm
(t/4")-gmm (3/8") gap between the bagger top and fender
and the bagger top surface should be even with the top
surface of the fender. To adjust bagger position:
Horizontal adjustment
Slightlyloosenthe nutssecudngthe baggerRH and LH
horizontaladjustment brackets.Loosenonlyenoughso
the bracketskeep their position,but allowthem to be
moved.
Move the brackets the amount forward or backward you
wish the bag assembly to move. Retighten the nuts
securely.
Vertical adjustment
Slightly loosen the nuts socudng the vertical adjustment
brackets. Loosen only enough so the brackets keep their
position, but allow them to be moved.
Move the brackets the amount up or down you wish the
bag assembly to move. Retightan the nuts securely.
Reinstall the bagger assembly and check the bagger to
fender fit. If necessary, repeat the procedure until proper
fit is attained.
To convert
to bagging,
mulching
or discharge
See "Section 5" of this manual.
25

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis