INSPECTION WITH SERVICE
Marudacturet's moorenendation for the INFUSOMAT-secura 990mWh intusion purr
Operator:
'The INSPECTION
WITH SERVICE is to be carried ot
subject to technical arendrent
and should
CHECK LIST
Visual controls
Cleanliness, completeness, damping,
moisiure anack and other influences
# ciean, if necessary
repair
Sealing membrane
- finger pump
- ar vap
# dean
Keyboard, mains switch
gezen of pressure plate (Y necessary elasiciy)
Glue on silicon support
Pump fap handle (cracking, hoider function)
Pump fap hinge (play.tres suspension)
# if necessary correct
Safety camnp/tree flow stop (function, gap width)
4 dean
Mains supply (Mains cable and plug connecton)
Staff
cal (plug connecton,
if necessary line)
Drop sensor (line, plug connection, strain relief, elasticity,
function)
# clean
Support-rubber
feet
Suppor
damp and holder
Fuses (2xT0.2A)
# it necessary
O
O
Documentation apart from Check list (Le. unit book/customer service report)
Function controls
(all measuring values must be documented)
Type shield, labels
# if necessary renew
Switch on unit (operation
with tesi set)
- Mans supply,
Display
(sell test, mains)
with
indication
~ 아보
Staff call (function or contact pass-through)
Alarm suppressing (funcion)
Working pressure of me pump
~ max. 0.9 - 1.Sbar
— bar
- min. 0.5 - 1.1bar
— bar
(start at 400muh check at 40min the lock
abiity-Occlusion
by pressure)
Safety clamp/Free-fiow
stop
- Pressure check (no tree how upto 0.4bar}
)
+ During accu vom corms)
min), no alarm should
be given
(integrate along cons
The INSPECTION with SERVICE was carried out by
Date/Signature
The order for this service was placed on
FactNo.
Appiance No.:
Manufacturer:
В. Braun Melsungen AG
Yesr
ci purchase:
according to the check fet due relerence to the service manual and the operation instructions
be carried out withir:'a period of 12 morths.
D
Open up unit
の 2ST
TPS / TTF / LFT / AB
ΜΕ
Key/switch:AR/
LFT/ RES UE/ RES ST/ RES UE-ST
Open up pump fiap at LFT-Signa!
Set up unit ready for use
Seal
Earth protection resistance < 0.1 Ohm
ー Ohm
(00k for measuring points) s 0.2 Ohm with mains cable — Ohm
isolation resistance >> 2 MOhm
ー mOnm
Leakage current
$0.03 mA
— MA
{at normal conditions)
if
i
current
necessary substitute-leakage
(according
to VDE 0751 part 1)
Pranto operation according to operating instructions
- Delivery accuracy +5
ー %
at approx. 80% οἱ The max. rate
(it necessary repeat with new set respectively at 10 or 90% of the
max, adjustable delivery ra rate)
・ Preselecoon of amouní wi
alarm at te end of infusion
O
pecuiariiesremarks
e.g. - exepiona! findings
.
+ Specifications,
- É necessory
pump holder, firm standing
setting up at the location, ambient conditions,
interface operation
er dara, modificaiens
1 Last repas, Does Ron
changes to above
mentioned es
- Directive safety
- Repairs under item R to be carried out carried out
- To point (x) of check fst (e.g. description of faults)
The next inspection date is scheduled
for the
Unit handed over
Service-Manual
ardi
emri
TO end Div it qui Rent
に に ルン
'Tins manatenance reference Must net De coped. partiyor
whote, nor made accernbie to therd parbes without cur
consent, and remains me Properly of Our company.
INF.secura 999mi
Seite
Ausgabe
Page
Edition
2
06/92
TECHNE Med io