Planning the installation
88
Operating instructions – AC SMART
8.3
Check list for initial commissioning
A commissioning protocol is available in our online catalogue.
On the EV charging box has been mounted and all connections have been
installed, the following points must be checked.
► Check to ensure all screws in the back of the EV charging box are
tightened.
► Check to ensure all cables fit properly on the terminal connections.
► Ensure that all cable entries are fully sealed or fitted with blanking plugs.
► Ensure that all cable glands are firmly closed.
► Screw in the cover of the EV charging box firmly.
► Check to ensure all screws are tightened.
► If available, install the design frame.
► Switch on the power supply to the EV charging box.
► Check the status LED.
► Complete the initial electrical commissioning according to the commission-
ing protocol. Observe the requirements of applicable standards and locally
applicable installation regulations.
► Complete the commissioning protocol.