Herunterladen Diese Seite drucken

Weidmuller AC SMART ECO Bedienungsanleitung Seite 84

Vorschau ausblenden Andere Handbücher für AC SMART ECO:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
84
Operating instructions – AC SMART
7
Preparing for installation
7.1
Selecting the installation site
Select an installation site that meets the following requirements.
– Flat, vertical wall or stand
– Substrate suitable of supporting at least 100 kg. The substrate must be
able to bear not only the weight of the EV charging box, but must also hold
securely if there is an accidental tensile load, for instance caused by the
charging cable or an impact.
– Sufficient space to operate the EV charging box
– Suitable environmental conditions
► Also observe the safety information (Chapter 2) and the information in the
technical data (Chapter 15).
7.2
Ordering installation
► Contact your grid operator to determine the applicable specifications and
provisions for using EV charging boxes in your location.
► Commission a qualified electrician to install the EV charging box.
► Observe the safety information in Chapter 2 as well as the Assembly and
installation instructions enclosed with the EV charging box.
7.3
Tools required
Tools required
Spirit level
Pin
Drill
Drill bit diam. 8 mm, length > 60 mm
Hammer
Cable cutter
Stripping tool
Stripping tool
Crimping tool
Torx
screwdriver T20
®
Torx
screwdriver T30
®
Weidmüller tools are available in our online catalogue.
Recommended
Weidmüller KT 45 R (9202040000)
Weidmüller AM-X (2625720000)
Weidmüller MULTI-STRIPAX 1.5-6.0S (9204560000)
or Weidmüller MULTI-STRIPAX 6-16 (9202210000)
Weidmüller STRIPAX PLUS 2.5 (9020000000)
Weidmüller SDIT SLIM T20 X 100 (2749720000)
Weidmüller SDIT SLIM T30 X 150 (2749740000)

Werbung

loading