Herunterladen Diese Seite drucken

Weidmuller AC SMART ECO Bedienungsanleitung Seite 85

Vorschau ausblenden Andere Handbücher für AC SMART ECO:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
7.4
Check list before installation
We recommend checking the following points before assembly and installa-
tion of the EV charging box:
– The locally applicable assembly and installation regulations are known and
can be complied with.
– The circuit breaker and residual current circuit breaker are installed accord-
ing to the desired power rating and the installed cable lengths.
– The required tools and materials are available.
– The enclosed fastening materials have been checked and are suitable for
the intended installation location. If not, other suitable installation materials
are prepared.
– The required lines and cables are available:
– Power supply cable (possible cable diameters: 14 – 54 mm)
– Signal cable and data cable (optional)
Preparing for installation
Operating instructions – AC SMART
85

Werbung

loading