Herunterladen Diese Seite drucken

Weidmuller AC SMART ECO Bedienungsanleitung Seite 63

Vorschau ausblenden Andere Handbücher für AC SMART ECO:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Contents
1
About these instructions
1.1 Applicable documents:
1.2 Illustrations and symbols
2
For your safety
2.1 Intended use
2.2 Personnel
2.3 Safety notes
2.4 Product modifications
3
Product description
3.1 AC SMART product family
3.2 Type plate
3.3 Product components
3.4 Connections and electronic components 71
3.5 Status LED and acoustic signals
4
Product functions
4.1 Network capability
4.2 Communication capability
4.3 Operating software web server and
AC SMART App
4.4 Charging the vehicle
4.5 Status information and error display
4.6 Download and delete charging data
4.7 Monitor charging process
4.8 Maximum charging current
4.9 Maximum asymmetrical phase current
4.10 LED inactivity
4.11 Digital inputs
4.12 Load/charge management
4.13 User authentication
5
Unpacking and checking the
scope of delivery
5.1 Unpacking the delivery
5.2 Checking the scope of delivery
Manufacturer
Weidmüller Interface GmbH & Co. KG
Klingenbergstraße 26
32758 Detmold, Germany
T +49 (0)5231 14-0
F +49 (0)5231 14-292083
www.weidmüller.com
65
6
Storing the EV charging box
65
7
Preparing for installation
65
7.1 Selecting the installation site
66
7.2 Ordering installation
66
7.3 Tools required
66
7.4 Check list before installation
66
8
Planning the installation
67
8.1 Installation Guidance
68
8.2 Network systems
68
8.3 Check list for initial commissioning
69
9
Networking and configuring the
70
EV charging box
9.1 Connecting the EV charging box
73
with the local network
9.2 Assigning the network settings
74
and IP address
74
9.3 Configuring the EV charging box
74
in the web server
9.4 Connecting the EV charging box to an
75
external device (Modbus)
76
9.5 Connecting the EV charging box to an
76
external device (digital input)
76
9.6 Starting Bluetooth coupling mode
76
9.7 Coupling the EV charging box with the
77
AC SMART App
77
9.8 Configuring the EV charging box via
77
AC SMART App
78
78
10
Operating the EV charging box
80
10.1 Charging the vehicle
10.2 Completing authentication
81
10.3 Separating vehicle from the
81
EV charging box after charging
81
10.4 Stopping the charging process
Document no.
Revision:
Operating instructions – AC SMART
83
84
84
84
84
85
86
86
87
88
89
89
90
92
100
102
102
103
103
104
104
105
105
106
2909750000
02/03.2023
63

Werbung

loading