Herunterladen Diese Seite drucken

Weidmuller AC SMART ECO Bedienungsanleitung Seite 109

Vorschau ausblenden Andere Handbücher für AC SMART ECO:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
12.2 Handling load/charge management
Fault
The charging process does
not start.
The satellite box only
charges with the minimum
charging current.
12.3 Error codes
Error ID
Description
1
The CP signal is invalid.
The fault could be caused by the
vehicle or the charging cable.
2
The PP signal is invalid.
The charging cable may be the cause
of the fault.
3
There is a diode error in the vehicle.
Possible cause
Load/charge management is activated
and the connected vehicle is on the
waiting list.
The satellite box does not have a con-
nection to the control box. The satellite
box reduces the charging current to 6 A
until the connection to the control box is
restored.
Recommended action
► Disconnect the charging cable from the vehicle.
► SOCKET variant: disconnect the charging cable
► Wait until the status LED is illuminated green.
► Connect the vehicle to the EV charging box once
► Start the charging process.
► If the error occurs again, try to start a charging
► If the error occurs again, contact an electrician.
► Disconnect the charging cable from the vehicle.
► SOCKET variant: disconnect the charging cable
► Wait until the status LED is illuminated green.
► Connect the vehicle to the EV charging box once
► Start the charging process.
► If the error occurs again, try to start a charging
► If the error occurs again, contact an electrician.
► Disconnect the charging cable from the vehicle.
► SOCKET variant: disconnect the charging cable
► Wait until the status LED is illuminated green.
► Connect the vehicle to the EV charging box once
► Start the charging process.
► If the error occurs again, try to start a charging
► If the error occurs again, contact an electrician.
Recommended action
► Provide the minimum charging
current of 6 A.
► Connect the control box to the
satellite box.
from the EV charging box as well.
again.
process with another vehicle or with another
charging cable.
from the EV charging box as well.
again.
process with another charging cable.
from the EV charging box as well.
again.
process with another vehicle.
Operating instructions – AC SMART
Troubleshooting
109

Werbung

loading