Operation
Actuate the control levers slowly, if possible in the idle gas of the carrier.
Operating the HVZ-GENIUS with an excavator:
Make yourself familiar with the operating elements for the both hydraulic circuits (main / side gripping
direction). Especially remind the function for opening the main gripping direction, that there is no accidental
opening while the installation clamp is lifted up and the layer falls down.
DANGER OF ACCIDENTS!
Activate the control lever as possible at idling speed of the support frame.
Move the operating lever almost at idling speed, because the great hydraulic flows of big excavators can
cause malfunctions or even damages of the HVZ-GENIUS.
6.1.1

Programms

In this program version the following programs are stored:
Program 1: „Standard program", for the laying of stone layers, which were be displaced from a so-
called „cross joint pattern" in a running bond, as soon as layers of stones, which shall be compressed
and layed from 4 sides.
Program 2: „without side clamping", for the gripping and laying of stone pavers only with the main
clamping. These program will be used, when rotating the position at 180° at every second laying cycle
of the HVZ-GENIUS to the stone layer.
To use the program 2, move the stop cock (under the covering hood) from horizontal position (flow
direction) in to the vertical position (blocking direction, see arrow in fig. A).
5140.0042
Fig. A
V1
35 / 45