Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance Intervals - probst POWER PLAN PP Bedienungsanleitung

Screeding machine
Inhaltsverzeichnis

Werbung

Operating instructions
PP
6.1

Maintenance intervals

Mechanical components
Maintenance interval
First inspection after 50
operating hours
Every 50 operating hours 
At least 1x year
(in harsh operating conditions, this
interval must be shortened)
Hydraulics
Maintenance interval
First inspection after 50
operating hours
Every 50 operating hours 
52 / 70
Maintenance and care
Maintenance work to be performed
Check all fastening screws and retighten if necessary. Observe the tightening
torques.
Retighten all fastening screws. Observe the tightening torques.
Check all joints, guides, bolts and gear wheels for proper function and readjust or
replace if necessary.
Lubricate all lubrication points. See "Lubrication".
Check all suspension components, bolts and shackles.
Check the machine for cracks, wear, corrosion and operating safety.
Check all fastening screws and retighten if necessary. Observe the tightening
torques.
Retighten all hydraulic connections.
Check the hydraulics system for leaks.
Check the hydraulic hoses for kinks and chafing.
Maintenance work to be performed
V1
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis