Herunterladen Inhalt Inhalt Diese Seite drucken

Maintaining The Crawler Tracks - probst POWER PLAN PP Bedienungsanleitung

Screeding machine
Inhaltsverzeichnis

Werbung

Operating instructions
PP
6.5.6

Maintaining the crawler tracks

Checking the crawler chain tension
The crawler chain tension must be checked every 100 operating hours.
Please refer to the separate manual for the engine crawler undercarriage (TFW) for a detailed description.
58 / 70
Maintenance and care
V1
1. Open the engine hood. See
"Opening the engine hood".
2. Press onto the v-belt (1) with your
thumb. The v-belt should give by
about 7-9 mm (A) when pressed
down.
3. If necessary, get the v-belt
tensioned by customer services.
4. If necessary, get the v-belt
changed by customer services.
5. Close the engine hood.
1. Lift the machine a small section off
the floor. See "Lifting the machine"
2. Check the dimensions of (A) in the
centre of the chain guide.
(A) must be 10-30 mm. If
necessary, tension or loosen the
crawler chain.
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis